Groundwater management
Underground construction projects - especially in the area of groundwater management - often require new approaches that spare resources, because large objects in the groundwater have various influences on the aquifer in which they are immersed. In construction work the groundwater must be lowered in as short a time as possible, but only as far as the situation requires. Our powerful EMSR department puts together the necessary regulating systems themselves, programs the software, and sets up the facilities on our construction site, which our expert personnel can then operate independently. In addition, we offer our customers read access to the construction site database. This allows transparent documentation at any point in time.


Groundwater management in the large project "Metro Cityringen"
Copenhagen, Denmark


Our areas of activity:

  • Reduction of the influence on the aquifer with the most modern methods and techniques

  • Documentation and inspection of the interference in the aquifer

  • Control of the desired influence on the aquifer through every type of set point (water level, amount of water, fill level indicator, etc.)

  • Visualization on PC/iPad/iPhone

Contact Persons

Tim Röder

Business area:
International, Groundwater Management

Hinterm Busch 23
49733 Haren (Ems)
Germany

Phone: +49 5934 707 588
Fax: +49 5934 707 26
E-Mail: roeder@hw-dewatering.com
Tim Röder

Björn Weber

Business area:
Water treatment, Groundwater management

Branch office west
Kallenbergstr. 24
45141 Essen
Germany

Phone: +49 201 83 11 60
Fax: +49 201 314 367
E-Mail: weber@hoelscher-wasserbau.de
Björn Weber

Heinz Schwarte

Business Unit Manager Dewatering

Business area:
Dewatering, Pipeline Dewatering, Groundwater Management

Hinterm Busch 23
49733 Haren (Ems)
Germany

Phone: +49 5934 707-82
Fax: +49 5934 707-68
E-Mail: schwarte@hoelscher-wasserbau.de
Heinz Schwarte