Hölscher Projects

Achim Compressor Station

The Achim Compressor Station is one of Germany’s most important infrastructure projects for the country’s future energy supply. Through efficient water treatment and groundwater reinfiltration, Hölscher is creating the conditions for safe construction operations across the approximately seven-hectare site.

Groundwater Management for the Achim West Compressor Station

During the construction of the Achim West Compressor Station, Hölscher Wasserbau is responsible for key aspects of water treatment and groundwater reinfiltration on behalf of the ARGE Hoch- & Tiefbau VDS Achim West consortium. Across the approximately seven-hectare construction site, high-performance environmental systems, an iron removal plant and around 85 DSI filters ensure that large volumes of groundwater are reliably treated and returned to the natural water cycle. In doing so, we make an important contribution to safe construction operations on a major infrastructure project for Germany’s energy supply.

Services and Technologies Used

Water Treatment and Groundwater Reinfiltration for Safe Construction Operations

The Achim West Compressor Station is one of the most significant energy infrastructure projects in northern Germany. During the construction phase, large volumes of groundwater must be reliably treated and returned to the natural water cycle. Hölscher is responsible for water treatment and groundwater reinfiltration, ensuring the necessary groundwater management conditions are in place to support continuous construction progress.

High-Performance Iron Removal with a Capacity of up to 200 m³/h

 

A key component of the water treatment process is a high-performance iron removal plant with a capacity of up to 200 m³/h. The extracted groundwater is treated before being returned to the natural water cycle, preparing it for subsequent reinfiltration.

Reliable operation of the plant is particularly important, as Hölscher also handles water volumes from other dewatering contractors working on the construction site. This places high demands on plant availability, operational reliability and response times.

Around 85 DSI Filters for Groundwater Reinfiltration

Around 85 DSI-Filter are used to return the treated groundwater to the aquifer. The patented hw-dsi method enables controlled and efficient reinfiltration, even of large volumes of water.

This allows the groundwater extracted during construction to be returned to the aquifer as close as possible to its original location. This minimises the impact on the natural water balance and supports the sustainable management of groundwater resources.

Up to 11 Kilometres of Pipework

An extensive pipework network connects the groundwater dewatering, treatment and reinfiltration systems. To achieve this, up to 11 kilometres of pipework have been installed across the construction site.

The pipework network connects the various system components and dewatering installations, enabling the reliable transport of water volumes across the entire construction site.

Complex Interface Management Across Seven Hectares

One of the key challenges of the project is the large number of parties involved. Three dewatering contractors are operating simultaneously across the approximately seven-hectare construction site. Hölscher also handles water volumes from other contractors’ dewatering systems, integrating them into its own treatment and reinfiltration processes.

The close coordination between different trades requires precise planning and a high degree of flexibility. At times, around 90 people are working on the construction site simultaneously. Reliable plant operation and rapid response times are therefore essential to ensuring uninterrupted construction progress.

Electrical, Instrumentation and Control Technology for Reliable Plant Operation

The complex plant systems are controlled and monitored using modern electrical, instrumentation and control technology. This supports the continuous operation of the water treatment and groundwater reinfiltration systems and ensures that the various plant components work together safely and efficiently.

Reliable control systems are particularly important when handling high flow rates and coordinating multiple dewatering operations, enabling a rapid response to changing conditions on the construction site.

Groundwater Management for a Major Energy Infrastructure Project

The Achim West Compressor Station forms part of an infrastructure network that plays an important role in securing future energy supplies. The overall project represents an investment of approximately €250 million and is connected to international gas supply networks, including those from Norway, the Netherlands and LNG terminals.

Through high-performance water treatment and groundwater reinfiltration, Hölscher provides the necessary groundwater management infrastructure to ensure safe and predictable construction operations. At the same time, returning groundwater to the aquifer close to its original location helps promote the sustainable management of water resources.

Achim West Compressor Station

The new facility will play a key role in supporting future energy flows. The new compressor station is scheduled to be commissioned in 2027.

Project Key Figures

200
Our water treatment plant removes iron from up to 200 m³/h of groundwater.
85
hw-dsi filters installed around the construction site are responsible for groundwater reinfiltration.
11
Up to 11 km of pipework have been installed.
250
GASUNIE's total investment in the construction project amounts to €250 million.