Frankfurt FOUR

The large-scale Frankfurt FOUR project involves the construction of four skyscrapers with an underground garage in the heart of the banking district in Frankfurt am Main. These skyscrapers, envisioned as the "new heart of the city," will range in height from 100 to 228 meters. The buildings will also feature a shared four-story underground garage. The development will include over 600 residential units, the country's highest office floors, a hotel, and a daycare centre.

A solid foundation for offices
and living spaces in the sky

Before the skyscraper foundations are laid, groundwater must be lowered temporarily. To achieve this, approximately 20 Quaternary wells with depths of around six meters and 65 Tertiary wells with depths between 20 and 34 meters were drilled in a confined space. The project also included 25 monitoring wells/groundwater measurement points,
1,000 meters of branch, ring, and collection pipelines and 200 meters of elevated discharge pipelines leading to Gallusanlage. The entire process was monitored by a complex monitoring and alarm system. The system comprises automatic flow meters and data loggers providing continuous oversight of the groundwater levels lowered during construction. The site was excavated using the top-down construction method.

Services and technologies used

Groundwater under control – Environmental responsibility

The extracted groundwater was treated by a complex two-stage purification system consisting of a booster station, filtration system with a clean water tank
and a sludge storage tank as well as multiple activated carbon and ion exchange filtration stages operating in series.

Quaternary and Tertiary well drilling in confined spaces

In tight construction conditions, 20 quaternary wells were drilled to depths of approximately six meters, and 65 tertiary wells were drilled to depths of 20 to 34 meters. This well structure ensured precise control of groundwater throughout the construction process.

Branch, ring, and collection pipelines, monitoring wells, and groundwater measurement points

Additionally, 25 monitoring wells and groundwater measurement points were installed to precisely track groundwater levels. Furthermore, 1,000 meters of branch, ring, and collection pipelines, along with a 200-meter elevated discharge pipeline to Gallusanlage, were installed to ensure efficient water drainage.

Monitoring

Groundwater management for the Frankfurt FOUR project was closely monitored by an advanced monitoring and alarm system. This system included automated flow meters and data loggers that continuously recorded and monitored the lowered groundwater levels during construction.

Project metrics

20
Quaternary wells – Approximately 6 meters deep.
65
Tertiary wells – Depths ranging from 20 to 34 meters.
25
monitoring wells/groundwater measurement points.
55
The office tower has 55 floors.
233
The tallest of the four skyscrapers will reach 233 meters.
600
The FOUR project will create 600 new apartments.
1000
meters of branch, ring, and collection pipelines have been installed.
213000
The entire site covers 213,000 m².

Frankfurt FOUR

The skyscrapers in the heart of Frankfurt will reach heights of up to 228 meters. We ensure that groundwater is temporarily lowered during construction through numerous wells and monitoring points.