Hotel and residential complex at Lake Tegernsee

A new development is currently under construction by Lake Tegernsee, featuring a hotel and residential complex with an underground garage, restaurant, and spa area. Hölscher Wasserbau was commissioned to manage the dewatering for the 36,000 m² excavation site.

Idyllic location with challenging geology

This project presents a unique challenge due to an ambitious schedule and complex soil conditions. The subsurface consists of a heterogeneous layering of lake clay and unweathered peat interspersed with gravel layers. Hölscher installed 74 wells reaching depths of up to 12 meters. Additionally, eight external wells were constructed outside the excavation site to prevent the accumulation of groundwater flowing toward Lake Tegernsee, redirecting it around the site and into the lake.

Services and technologies used

Preserving natural water flow

Eight additional wells were installed outside the excavation to prevent the build-up of groundwater flowing into Lake Tegernsee. These wells redirect the groundwater around the site and directly into the lake, protecting the excavation while maintaining the natural water flow.

Dewatering

For the construction of the hotel and residential complex at Lake Tegernsee, dewatering is ensured by 74 wells. These wells, reaching depths of up to 12 meters, keep the excavation dry despite challenging geological conditions, creating optimal conditions for construction.

Efficient control for minimal groundwater fluctuations

The construction site is enclosed, interrupting the natural run-off from the surrounding mountains. To prevent water build-up that could cause moisture damage to nearby basements, we installed wells outside the excavation. These wells divert the accumulating water around the site and into Lake Tegernsee. The pumps in these wells are regulated to ensure that groundwater levels in the surrounding area only fluctuate minimally. This measure is crucial because many neighbouring buildings are founded on old wooden piles. If these piles dry out, they could suffer severe structural damage, as they would no longer be able to support the weight of the buildings.

Project metrics

3
construction phases
12
The wells are 12 meters deep.
34
apartments will be built in the southern section of the site.
74
wells were installed for dewatering.
170
The hotel complex has 170 beds.
2028
The project will be completed in 2028.
36000
The excavation area comprises 36,000 m².

Hotel and residential complex at Lake Tegernsee

We drilled 74 wells up to 12 meters deep to manage dewatering for the 36,000 m² excavation at Lake Tegernsee. 8 additional wells prevent groundwater accumulation.

Got a question about our solutions?
We have the answer.

Contact your personal representative today and start planning your custom project.
We will find the right solution for you.

Contact us now

Hotel and residential complex at Lake Tegernsee: